cv

Basics

Education

  • 2023.09 - 2026.06

    Beijing, China

    M. E.
    Beijing Jiaotong University
    Transportation Planning and Management
    • GPA: 3.15/4.0 (80.6/100)
  • 2018.09 - 2022.06

    Beijing, China

    B. E.
    Beijing Jiaotong University
    Traffic Engineering
    • GPA: 3.1/4.0 (79.9/100)

Publications

Projects

  • 2025.5 - Present
    Time-restricted On-street parking management under road congestion
    Explored the bidirectional relationship between time-restricted on-street parking policy and transportation network equilibrium in the context of urban road networks
    • A Discrete network design problem was proposed to capture the interaction between on-street parking policy(upper-level) and the user equilibrium traffic assignment(lower level)
    • Global optimization was pursued by iterative bound-tightening. Computed LB by solving Relaxed problem with Kelly's cutting plane method, UB with Frank-wolfe algorithm. Added UE-reduction cuts and no-good cuts to accelerate convergence
  • 2025.06 - 2022.08
    Vitasoy beverage production advanced planning and scheduling
    Developed schedule plans for Vitasoy beverage production line to meet business need, maintain inventory at optimal level, minimize production line changeover costs
    • Penalty method were introduced to handle soft constraints such as inventory level and material production ratio
    • Lexicographic method were applied to solve the multi-objective problem
  • 2023.10 - 2025.05
    Impact of Spatio-Temporal evolution of freeway networks on Socio-Economic Dynamics: A case study from Fujian, China
    Explored the relationship between freeway network evolution and socio-economic dynamics
    • Multiscale geographically and temporally weighted regression (MGTWR) was employed to quantify the economic stimulatory effects of freeway network evolution

Work

  • 2025.06 - 2025.08
    Algorithm Engineer Intern
    UHAlean Information Technology (Shanghai) Co., Ltd
    • Designed and implemented a suite of demand forecasting algorithms for Shell plc oil products. Deployed algorithms included time-series methods (ARIMA, Exponential Smoothing) and machine learning algorithms (XGBoost)
    • Engineered and implemented an advanced production scheduling plan for VitaSoy beverage production, formulated and solved a multi-objective optimization problem under real-world complex constraints
  • 2023.05 - 2023.09
    Project Assistant
    Beijing Zohetec Co., Ltd

Skills

Programming languages
Python
Java
Shell
Data Analysis
Python(Pandas,NumPy)
SQL
SPSS
Solver
Gurobi
GIS
ArcGIS
QGIS
DevOps&Tools
Git
Docker
LaTex
Markdown

Languages

English
IELTS 7.5
Mandarin Chinese
Native

Interests

Transportation network modeling and optimization
Transportation Network design Problem
Transportation Economics
Spatio-Temporal Traffic Analysis